In Bold Letters it is the answer of the mcq'sView more random threads:
- CS506 Web Design and Development Online Quiz No. 04...
- MGT503 Principles of Management mid term paper 2011 solve...
- Quizes of MGT111 for Final Term....
- vu online quiz Cs504 quiz no 3 fall 2012
- cs101 Introduction to Computing solve mid term paper 2011
- MTH302 Business Mathematics mid term paper 2011
- cs410 download the quiz 4/01/2011
- MGT501 -Human Resource Management Online Solved MCQS Quiz...
- cs614 dataware house solved quiz for 2012
- mcm301 latest quiz fall 2010 29/12/2010
download the file
.........technique was initially developed for manufacturing processes in the 1920’s by Walter Shewart.
Contorl chart
When more than one users interpret the same requirement in different ways then we can say that the requirement is:
If we plot a graph between defects reported, and defects fixed then:
Difference between defects reported and fixed will show the defects yet to be fixed
Control charts are of following two types:
Moving range control charts and Individual control charts
For a software the total number of requirements are equal to ________
Functional requirements + non functional requirements
Quality can be measured if we measure the _____ of the product.
Correctness
Identify the TRUE statement:
Same process metrics may vary from project to project
In context of moving range and individual control charts, LNPL stands for:
Lower Natural Process Limit
Identify the most appropriate statement:
The quality of the software specification is of extreme importance.
_______ is the measure of how many defects are removed by the quality assurance processes before the product is shipped for operation.
Defect removal efficiency
Sponsored Links