Sponsored Links


Page 3 of 3 FirstFirst 123
Results 21 to 22 of 22

Thread: Essay writing competition in Pakistan 2012

  1. #21
    Junior Member
    Join Date
    Jul 2012
    Posts
    1
    Sponsored Links1


    Electricity problem in Pakistan"

    Introduction:

    The country may plunge into energy crisis by the year 2007 due to rising electricity demand which enters into double digit figure following increasing sale of electrical and electronic appliances on lease finance, The shortage in electricity production in Pakistan is worsening day by day which is causing long break downs and load shedding as called by government. The crisis started about a year ago when all of sudden the electricity consumption increased to a point where all the electricity producing sources failed to fulfill the demand. Apparently it is a matter of supply and demand. The gap between the demand and supply resulted in routine load shedding.

    Causes:
    The country is facing a huge electric power crisis today. This crisis appears insurmountable in the near or even long-term future, unless proper understanding and correct implementation is undertaken on priority basis. The demand for electricity in Pakistan during the winter months actually goes down and this winter has not been an exception. The systemic issues such as the failure to build new dams and Gen. Mushraf Government's inability to add even a single megawatt of new power to the grid during 9 years of his rule, it seems that the present crisis is a result of bad management and the lack of foresight. The total installed capacity of WAPDA and KESC totals around 19,500 megawatts. Almost two third of this power comes from thermal power plants (fossil fuels), one third is generated by water and about 2% comes from nuclear power plants.
    Throughout the month of December, the electricity consumption in Pakistan hovered around 11,000 MW, down from the peak levels of 17,500 MW seen in summer. This demand was well within the installed capacity of WAPDA & KESC yet they were only generating a meager one third (6500MW) of their maximum capacity during this period leaving a huge gap between supply and demand. There are two main reasons for this:
    1. The water flow from all major dams was halted starting mid December to allow the annual cleaning of canals in January. This action effectively took all the hydro power off line.
    2. The thermal power plants were working far below their potential due to the lack of money caused by the circular debt between various government agencies reaching a staggering 400 billion Rupees.
    .



  2. #22
    Administrator Xpert's Avatar
    Join Date
    May 2010
    Location
    Jhelum
    Posts
    6,239
    Dear your material is copy pasted from several websites.
    for example
    Code:
    www.blurtit.com/q600705.html
    
    www.shaheenenterprise.com/energy-crisis-and-Pakistan.html
    it is not acceptable.

    Sponsored Links

Page 3 of 3 FirstFirst 123

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. National Essay Writing Competition Results of Virtual University
    By punjab-university in forum Virtual University Announcenments
    Replies: 0
    Last Post: 12-03-2014, 03:44 PM
  2. UVAS Essay Writing and Poster Competition October 25,2014
    By Entboy in forum Other universities
    Replies: 0
    Last Post: 10-16-2014, 05:37 PM
  3. Virtual University Start National Essay Competition 2014
    By education-2014 in forum Virtual University Announcenments
    Replies: 0
    Last Post: 08-11-2014, 10:26 PM
  4. Replies: 0
    Last Post: 03-11-2014, 12:01 AM
  5. Replies: 0
    Last Post: 12-18-2012, 02:04 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
-: Vuhelp Disclaimer :-
None of the files shown here are hosted or transmitted by this server. The links are provided solely by this site's users. The administrator's or staff of Vuhelp.net cannot be held responsible for what its users post, or any other actions of its users. You may not use this site to distribute or download any material when you do not have the legal rights to do so. It is your own responsibility to adhere to these terms. If you have any doubts about legality of content or you have any suspicions, feel free to contact us.
Online Education | JhelumSoft