Suppose, if you were to developing a new room for your house, the following specific activities you would expect to be undertaken and the following representations you would expect to be produced.View more random threads:
- FIN722 Assignment No 1 Fall 2014 Solution and Discussion...
- MTH202 Assignment Solution 3 (July 2010)
- Assignment No.2 (Course STA301) Spring 2010 May 4
- ACC311 Fundamentals of Auditing Assigments N.02 Spring...
- MGT602 Entrepreneurship Assignment No.2 Fall Semester 2013
- Managerial Economics - Eco404 Assignment No.1 Solution Fall...
- PSY403 Social Psychology Assignment No. 02 Due Date:...
- HRM627 Human Resource Development Assignment No.1 Solution...
- MGT602 Entrepreneurship Assignment No. 1 Idea Solution Fall...
- Virtual University of Pakistan 7th convocation
A: Initiation: You would initiate the system by deciding that you wanted a room, and produce the application description that broadly described what you wanted. This may be expressed in a letter, sketch or verbally and would form the basis of discussions with experts such as builders and architects.
B: Analysis of requirements gathering: You would produce a requirements specification detailing what the room was for (for example, a kitchen, a lounge, a bedroom), the amount of money available, how large it was to be and so on. This requirements specification thus describes the purpose the uses and the constraints that apply to your room. It would probably be produced in consultation with a builder or an architect and expressed in terms of sketches and a natural language description.
C: Design: An architect would produce a set of blueprints (a detailed, formal system design) which represented you requirements.
D: Implementation: A builder would use the blue prints to build the design and produce your room.
E: Operation and Management: During the lifetime of the room, you might change its purpose (for example, a bedroom becomes a study room) and you would certainly have to maintain it by repainting and so on.
F: Validation, Verification and testing: During these processes you would be checking that the developing product met you requirements (Validation) and was being developed in accordance with the plans (verification). You would also test parts of the product (for example that a window was at the correct height).
Question:
Using the information regarding developing a new room for your house discussed above, now write down a situation where you would start the development process with
a) A conceptual design.
b) A Physical Design.
How might the development continue in each case? [20]
Sponsored Links
Note:
o Assignment should be in your own wordings not copied from net, handouts or books.
o Your answer should be “to the point” and not more than 5 lines.
Solution will be uploaded soon