    Icon14 cs504 assignment no 1 Spring 2011 idea solution of software engineering

    Sponsored Links1


    Q1 [Marks 10]

    During the construction of a motorway link road, for shifting an Interchange 5 Km ahead of its current location after it has already been built, it is going to be very costly. It could be easily fixed if realized earlier.”

    1) Create an analogy of the software development phases with above scenario.

    2) Also mention the most suitable and worst phase (justify your answer with solid reasons in each case) for a “needed change” in case of software development regarding cost and efforts.

    Q2 [10 Marks]

    Draw the use case diagram of the following scenario

    As System Analyst at Pakistan Railways, you need to model a Ticket Selling System for Terminal computers (TSSTC). Reading the Functional Specification of the system, you draw the following conclusions:


    1. The main purpose of TSSTC is to use it for searching the “Train Timings” and purchasing the train tickets.



    1. TSSTC consists of touch screen as an interface between passenger and system, credit-card reader and a printer to print tickets.



    1. Each passenger uses available interface to search the available routs and train times from which he selects one train.



    1. After he selects the train, the terminal screen displays the available seats in that train.



    1. The passenger selects the seat and the system prompts the total fare.



    1. The payment is then made by credit card (using credit-card reader).



    1. The system confirms the payment. If the payment is not confirmed, system displays an error message and transaction is terminated.



    1. If the payment is confirmed, the ticket will be issued and printed by the printer, from where the passenger collects his ticket.


    Sponsored Links
    Attached Files Attached Files

  2. #2
    plz give the solution

  3. #3
    plz kisi ne assignment solv ki hai tu post ker do

  4. #4
    Administrator Xpert's Avatar
    Join Date
    May 2010
    Location
    Jhelum
    Posts
    6,239
    During the construction of a motorway link road, for shifting an Interchange 5 Km ahead of its current location after it has already been built, it is going to be very costly. It could be easily fixed if realized earlier.”

    1) Create an analogy of the software development phases with above scenario.
    Answer: Let us try to understand this with the help of an analogy of a above senario. If we are at an advanced stage of Construction of a motorway link, for shifting an interchange 5 Km ahead of its current location when it has already been built costly. On the other hand if this need is identified when the maps are being drawn, one can fix it at the cost of redrawing the map only. In the case of a software development, we experience the exact same phenomenon - if a problem is identified and fixed at a later stage in the software development process, it will cost much more than if it was fixed at and earlier stage.

    2) Also mention the most suitable and worst phase (justify your answer with solid reasons in each case) for a “needed change” in case of software development regarding cost and efforts.
    The most suitable case for fixing this problem is when we are drawing this problem on the map it is less costly and can be fixed.
    Worst case that we find it after building the whole project it will cost us up to 60% or more some says 200% of the whole project.

  5. #5
    Junior Member
    Join Date
    Jan 2011
    Posts
    3
    please upload the idea solution

  6. #6
    Junior Member
    Join Date
    Jan 2011
    Posts
    3
    sir please upload the solution file ocf cs504 14 is last date

  7. #7
    sana.pari
    Guest
    Second question answer

  8. #8
    Junior Member
    Join Date
    Apr 2011
    Posts
    1
    Dear Sana Jee,
    Kindly up load Q1 idea solution also please please!
    Regards

  9. #9
    Junior Member
    Join Date
    May 2010
    Posts
    3
    aj tou bonus day

  10. #10
    Administrator Xpert's Avatar
    Join Date
    May 2010
    Location
    Jhelum
    Posts
    6,239
    I am sorry i am late in this solution. You can find it and please make changes. its the answer of first question.

    During the construction of a motorway link road, for shifting an Interchange 5 Km ahead of its current location after it has already been built, it is going to be very costly. It could be easily fixed if realized earlier.”

    1) Create an analogy of the software development phases with above scenario.
    Answer: Let us try to understand this with the help of an analogy of a above senario. If we are at an advanced stage of Construction of a motorway link, for shifting an interchange 5 Km ahead of its current location when it has already been built costly. On the other hand if this need is identified when the maps are being drawn, one can fix it at the cost of redrawing the map only. In the case of a software development, we experience the exact same phenomenon - if a problem is identified and fixed at a later stage in the software development process, it will cost much more than if it was fixed at and earlier stage.

    2) Also mention the most suitable and worst phase (justify your answer with solid reasons in each case) for a “needed change” in case of software development regarding cost and efforts.
    The most suitable case for fixing this problem is when we are drawing this problem on the map it is less costly and can be fixed.
    Worst case that we find it after building the whole project it will cost us up to 60% or more some says 200% of the whole project.

Page 1 of 3 123 LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Replies: 1
    Last Post: 06-27-2013, 01:32 AM
  2. Replies: 0
    Last Post: 04-26-2013, 05:39 PM
  3. Replies: 3
    Last Post: 06-18-2012, 04:41 PM
  4. Replies: 1
    Last Post: 07-01-2011, 02:47 PM
  5. Replies: 4
    Last Post: 05-05-2011, 04:02 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
-: Vuhelp Disclaimer :-
None of the files shown here are hosted or transmitted by this server. The links are provided solely by this site's users. The administrator's or staff of Vuhelp.net cannot be held responsible for what its users post, or any other actions of its users. You may not use this site to distribute or download any material when you do not have the legal rights to do so. It is your own responsibility to adhere to these terms. If you have any doubts about legality of content or you have any suspicions, feel free to contact us.
Online Education | JhelumSoft