View more random threads:
- CS201 assignment no 4 solution fall 2010 on 20/01/2011
- CS302 Digital Logic Design Assignment No.3 Solution Spring...
- CS615 Assignment no 5 ide solution fall 2011 January 2012
- CS403 Database Management Systems Assignment No.3 Solution...
- Assignment No. 01 SEMESTER FALL 2011 CS607- Artificial...
- CS508 Modern Programming Languages Assignment No.3 Fall...
- CS601 VU Current Assignment No.1 Spring April 2012 Last...
- CS614 Data Warehousing Assignment No.1 Solution &...
- CS604 Operating System Assignment No. 2 Semester Fall 2012
- CS401- Computer Architecture and Assembly Language...
CS615 Software Project Management Assignment No. 1 Solution Spring 2013
Assignment No. 01
Semester: Spring 2013
CS615 Software Project Management
Total Marks: 20
Due Date: 03/05/2013
Assignment:
Question 1: 10 Marks
Identify from the given situations, which one is project and which one is a process? Identify each with one line solid reason. (0.5 + 0.5 =1 Mark Each)
1. Designing a map for new office building.
2. Constructing a new office building.
3. Changing the oil of a vehicle.
4. Conducting polling for Election.
5. Developing Core i5 computer based system.
6. Loading of Luggage in a vehicle.
7. Payroll calculation of staff members.
8. Deploying a traffic plan system.
9. Teaching particular subject to a class.
10. Civil services competitive examination 2013.
Question no 2: 10 Marks
Suppose you are required to develop a Hospital Management System for providing different online services to the patient attenders and the staff, which is considered as the complex system as along with patient record, medicinal record is also kept, which keeps on changing with the demanding requirement of the health sector. You being a Software Project Manager facing different requirements changing time to time by the management of the hospital. You are leading a team of software engineers and you need to choose the process model first for having an effective design model before proceeding to coding phase. Which process model you choose and why you choose the selected process model? State with any four solid reasons. 2 + (2*4= 8) = 10 Marks
Sponsored Links
NOTE: Submit “.doc” file only. Every student should provide his/her own work, exact copying of the assignment (or some portion of the assignment) from the internet or other students will lead to copy case and zero marks will be awarded. Different softwares will be used to check plagiarism in assignments. Do not put any query on MDB about this assignment, if you have any query then email at CS615@vu.edu.pk
Deadline:
Your assignment must be uploaded/submitted on or before 3nd May 2013.
There are currently 1 users browsing this thread. (0 members and 1 guests)