    Icon21 MGMT627 GDB idea solution spring May 2011

    Sponsored Links1


    In planning a project, the project manager must divide the work into small elements that are manageable, independent, integrate able and measurable.

    However, breaking the work down to extremely small and too much detailed work packages, it will affect the smooth running of the project. Discuss what could be the three possible problems which could affect the project.



    Sponsored Links

  2. #2
    Administrator Vuhelper's Avatar
    Join Date
    Apr 2011
    Posts
    9,578
    he Work Breakdown Structure (WBS) is the basis for scheduling techniques such as the Arrow Diagramming Method and the Precedence Diagramming Method. At low levels of the Work Breakdown Structure (WBS), the interdependencies between activities can become so complex that meaningful networks cannot be constructed. To cater to the above-mentioned problems, one solution is to create "hammock" activities, which encompass several activities where exact cost identification cannot or may not be accurately determined. Some projects identify a "hammock" activity called management support (or project office), which includes overall project management, data items, management reserve, and possibly procurement. The advantage of this type of hammock activity is that the charge numbers are under the direct control of the project manager. In addition to this, there is a common misconception that the typical dimensions of a work package are approximately 80 hours and less than two weeks to a month. Although this may be true on small projects, this would necessitate millions of work packages on large jobs and this may be impractical, even if line managers could control work packages of this size. Cost analysis down to the fifth level is advantageous, from a cost control point of view. However, it should be noted that the cost required to prepare cost analysis data to each lower level might increase exponentially, especially if the customer requires data to be presented in a specified format that is not part of the company's standard operating procedures. The level-5 work packages are normally for in-house control only. Some companies bill customers separately for each level of cost reporting below level 3.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. GDB hrm 627, alt. code mgmt627.. plz idea solution.. if possible
    By aysha khawaja in forum GDB Discussion
    Replies: 0
    Last Post: 11-15-2011, 08:36 AM
  2. Replies: 0
    Last Post: 07-07-2011, 03:37 AM
  3. Replies: 0
    Last Post: 07-01-2011, 01:19 AM
  4. Bnk604 GDB idea solution Solution spring June 2011
    By Vuhelper in forum GDB Discussion
    Replies: 0
    Last Post: 06-02-2011, 06:57 PM
  5. Replies: 0
    Last Post: 04-14-2011, 04:57 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
-: Vuhelp Disclaimer :-
None of the files shown here are hosted or transmitted by this server. The links are provided solely by this site's users. The administrator's or staff of Vuhelp.net cannot be held responsible for what its users post, or any other actions of its users. You may not use this site to distribute or download any material when you do not have the legal rights to do so. It is your own responsibility to adhere to these terms. If you have any doubts about legality of content or you have any suspicions, feel free to contact us.
Online Education | JhelumSoft