Sponsored Links


Results 1 to 1 of 1

Thread: CS619 Final Year Project Catering Stock Program vu Spring 2014

  1. #1
    Administrator Xpert's Avatar
    Join Date
    May 2010
    Location
    Jhelum
    Posts
    6,239

    CS619 Final Year Project Catering Stock Program vu Spring 2014

    Sponsored Links1



    virtual university of Pakistan CS619 Final Year Project Catering Stock Program vu Spring 2014

    Catering Stock Program
    Software Requirements Specification



    1.0 Introduction

    This document contains the Software Requirements Specification of Catering’s Stock Control Program.

    1.1 About the Company

    Catering Support Service Company is into a wide range of catering operations including workers camps, cafeterias, canteens, banquets and outdoor catering services, This company also operates different accommodation complexes that provide a complete package of serviced housing including catering, housekeeping, laundry and other hospitality services for a variety of customers. With its base at a city, the company’s operations are spread over a wide territory of a country. Following is an overview structure of our organization.

    Sponsored Links




    Attachment 22815





    2.0 Purpose:

    New Stock program for control and monitoring of Stock Receipts, Transfers, Consumption and Physical Count and discrepancies. This program should be simple and helpful not only to the Store Keeper to handle the daily issues and request for production but also to the supervisor/area controller for monitoring of stock quantities and cost well before the production.

    3.0 Scope:
    The general process will be starting from requisition to Receiving Goods, Transfer in, Transfer
    Out, Consumption of goods, getting closing stock and taking the physical stock. Inventory will be based on Stock Card and Stock Sheet, Stock card is transaction details of one item and stock sheet will be transaction details of all items. Maintaining and tracking the daily stock movement in an efficient way, so that it can be audited any time and data can be exported in required format.


    4.0 Aim & Objective of the project
    The main aim of this project is to provide a better system to the sites to handle all their daily stock related activities digitally. So that the stock can be managed at the individuals sites and then data can be exported and sent to head office for consolidation and upload stock transactions into our ERP system. So, that the performance of the sites can be monitored and can be audited as well. Also To produce a simple, yet suitably effective user friendly interface and a system that is easily maintainable, efficient and practical.

    The proposed system should have the following objectives to be achieved.
    · Offline application
    · User Friendly Environment, Easy to use
    · Lesser data size and Space with low system spec. requirement
    · Easy searching and data entry option
    · Data templates for re usability
    · Fast information Retrieval
    · Less man power literacy requirement
    · Accuracy of data with Accountability
    · Data import export Facility

    5.0 Overview

    5.1 Existing System:
    Currently CSSC (Catering Support Service Company) is using excel based application called “Stock Program”.

    5.2 Drawbacks:
    · Size of data is huge which can’t be emailed.
    · Query based Reporting not available.
    · Require lot of Technical support.
    · Unable to consolidate data of different sites.
    · Unable to export data in required formats.
    · Due to multiple linked excel sheets, maintaining fixed file path is difficult.
    · Problem while changing file names and path.
    · Difficult to create more sheets because of long formulas.
    · Unable to track Purchase Discrepancies
    · Unable to do Requisition Consolidation
    · Notifications or prompts to highlight stock level or expiry date not available.



    6.0 Plan:
    As per the business process Purchase dept. is central and doing purchases centrally, located in
    head office for all the multiple projects. While, the purchase order will be processed in head office and copy will be sent to the projects and suppliers. Project will received items and will maintain their stock using stock program and will be exported and sent to the head office periodically by using mediums like: flash drive, email. Where all the projects data will be consolidated and analyzed by the concerned. Based on that data the project’s stock, daily cost and man-days will be extracted. And necessary actions will be taken. The consolidation will be done in three layers 1. Projects individually 2. Area Wise 3. Company wise. Ultimately the required data will be exported and uploaded into the main ERP system.


    7.0 Requirement Specifications:

    7.1 General Overview:

    Head office will send exported data of updated items master list along with the projects list to all the projects who will import it into their system for use.

    User must select Number of person he needs to cook food for and the menu items. System shall calculate the requirement based on number of persons. And shall check for the available stock. Accordingly the requisition will be generated by the system.

    User will receive stock through supplier or warehouse and will log the quantities and unit price, expiry date (not mandatory for all items) of the item. User can also transfer stock to another project store (called Transfer out) with quantity and amount. User can also receive stock from another project store (called Transfer In) with quantity and amount. User will enter the stock consumption in the system to get daily closing stock.

    This all movement in stock will result into following:

    a. Maintaining Stock Sheet.

    b. Maintaining Stock Card.
    c. Per many day cost (if user have served 200 people in a day with cooked food. It will be divided on the food material consumed cost per day).
    d. Control of stock.
    e. Stock movement tracking.
    f. Multiple dimensional Reports, soft will be exported to be sent to head office.

    g. Performance analysis
    h. Consolidation of multiple stores data at head office.
    i. Summary reports with different aspects. (Req, Purchases, Transfers, Project wise summary)
    j. system should show fast moving and slow moving items based on consumption pattern in a defined period.
    k. should have option to lock Date or week (user should not be able to enter back dated trans. But supervisor or admin. Can have access to do so.)

    Following is the Stock cycle diagram for understanding:




    Attachment 22816



    Closing Stock = Opening + Receipts + Transfer In – Transfer Out - Consumption



    Featured specifications are as mentioned below:

    7.2 Internal Store Requisition:




    Attachment 22817


    Daily Internal Store Requisition Process


    Cook will raise daily internal store requisition will submit for Supervisor approval. Based on number of man-days, Menu and available stock. Internal Store requisition can be same as per the previous days so using saved templates functionality (or copy) user will create internal store requisition. At the end of the day those items will be considered as consumed. After final approval of requisition it will be sent back to the project that will upload their approved requisition. Versions of requisitions can be maintained in the system, to see how much they requested and how much was approved. But older version will not be active to use. Receiving of material will be as per the latest version.



    7.3 Site Requisition (periodically):
    Below diagram will explain the site requisition process:

    Attachment 22818


    7.3.1 Site Requisition
    Project store keeper will raise store requisition based on requisition types (Arabic, pak, indo. Etc.)
    From the man-days categories. Against each category user will input number of man-days and a system should generate site requisition based on historical values analysis like a form with columns of number of man-days category wise, items #, item name, on hand qty., previous periods qty. values compared to entered man-days and additional qty. e.g.; if in last month or period the consumption qty. was 50KG of xyz items for 200 man-days. And now user needs that item for
    250 man-days, now system should calculate per man-day qty by using formula
    (50KG/200MD)=0.25KG/MD and then should show qty to be ordered as 250x0.25KG=
    62.50KG. Now if user want to request e.g.; 65KG due to certain reason, then he must enter the additional qty. 2.5KG in a separate column.


    ]Attachment 22819


    7.7 Consumption:
    As per 2.1 the goods daily internal store requisition will be theoretically same as consumption.
    Project will request whatever he needed to be consumed daily not more. The adjustments can be done by area controller at the end of the week for variances.


    7.8 Closing Stock:
    System will generate the closing stock based on all inventory transactions details, of opening balance, purchases, transfers and consumptions, which is called stock Card and Stock sheet Reports. System should highlight the near expiry items so that it becomes significant that there is a stock which is going to expire during a defined period. E.g.; in next two weeks.

    Closing Stock = Opening Balance + Purchases + Transfer in – Transfer Out – Consumption

    7.9 Physical Stock:
    Weekly store keeper will take stock count of all the items with expiry date log. And will send report to head office.

    8.0 Tools and Technology:
    1. This software should be developed using SQL Server Express database. This shall be developed as desktop application only which will be used at our multiple projects as well as at head office (for consolidation of all projects data using import export functionality).
    2. User should login using their login credentials and system should also keep login history.
    3. There could be scenarios where one user using one computer can do transactions for two projects. System should also be able to handle that.
    4. There will be three levels of use of this software a. individuals Project b. Area Office c. Operations Dept.

    9.0 Attachments:
    For the business requirement understanding the following detailed document may be provided.
    1. CSSC Stock Structure
    2. Item Coding Structure
    3. CSSC Item Coding Procedure
    4. Item Master List
    5. Projects Name List
    6. Existing Stock Program with data
    7. Existing Stock program Procedure

    Attachment 22820


    Attachment 22821


    Attachment 22825


    Attachment 22826


    CS619-679-11.jpg
    Attached Images Attached Images

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. CS619 final year project "Virtual Screen Splitter (VSP)" VU Spring 2014
    By Xpert in forum Projects,Thesis Disscussion
    Replies: 0
    Last Post: 05-06-2014, 05:31 PM
  2. CS619 Final Year project "LYRICSER” The Sound Mixer VU spring 2014
    By Xpert in forum Projects,Thesis Disscussion
    Replies: 0
    Last Post: 05-06-2014, 05:26 PM
  3. CS619 MobiQuiz Final Project for sale Spring Semester April 2013
    By Vuhelper in forum Projects,Thesis Disscussion
    Replies: 0
    Last Post: 04-24-2013, 08:37 PM
  4. Replies: 0
    Last Post: 03-17-2012, 12:38 AM
  5. result of cs619 vu final year project fall 2012
    By Xpert in forum Projects,Thesis Disscussion
    Replies: 0
    Last Post: 03-17-2012, 12:24 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
-: Vuhelp Disclaimer :-
None of the files shown here are hosted or transmitted by this server. The links are provided solely by this site's users. The administrator's or staff of Vuhelp.net cannot be held responsible for what its users post, or any other actions of its users. You may not use this site to distribute or download any material when you do not have the legal rights to do so. It is your own responsibility to adhere to these terms. If you have any doubts about legality of content or you have any suspicions, feel free to contact us.
Online Education | JhelumSoft