CS615 Software Project Management Quiz No. 1 Fall 2014 Solution & Discussion Due Date: December 05, 2014


Quiz will be from Lecture # 01 to Lecture # 11 , it will be based upon Multiple Choice Questions and opened for 48 hours.


CS615 - Software Project Management



Software design is actually a multi step process that focuses on _______ distinct attributes of a program

2

3

4

5



When you build a product or system, it's important to go through a series of predictable steps – a road map that helps you create a timely, high-quality result, The road map that you follow is called a __________

Software design

Software Process

Software schedule

Framework

The check-in and checkout facilities provide___________

Best control

Component control

SCI control

Synchronization control



Which of the following might require re-baselining of the cost baseline?

Corrective action

Revised cost estimates

Updates to the cost management plan

Budget updates



Once the review is complete, the Software Requirements Specification is "signed-off by _________

Developer

Customer

Top level Management

Both Customer and Developer.



REF:: Once the review is complete, the Software Requirements Specification is "signed-

off by both the customer and the developer.





Controlling Versions is activity of ________

Construction

Testing

SCM

Design



________ identify which quality standards are relevant to the project and determines how to satisfy them

Quality planning

Quality assurance

Quality control

Process control



The British Standards Institution (1986) has stated the quality as

The ability of a software product to satisfy its specified requirements

"An inherent or distinguishing characteristic or a property"

“Quality is in the eye of the beholder, a matter, of the client's judgment.”

All of the given





________ ensures that the standards laid down for a project are followed.

Quality assurance

Quality control

Product evaluation

Process control



________ ensures that appropriate steps to follow the product development procedures are carried out

Quality Management

Design

Process monitoring

Quality Control



These all are Product Revision Factors except

Usability

Maintainability

Flexibility

Testability



To control versions, you can use_____________

Version Control File

Version Control Register

Version Control authority

All of given



_________is an umbrella activity that ensures conformance to standards and procedures throughout the SDLC of a software product.

SQA

Design

Testing

All of given



All of the following are benefits of meeting quality requirements

An increase in stakeholder satisfaction

Less rework

Low turnover

Higher productivity



The Preliminary Users Manual presents the software as a black box: That is, heavy emphasis is placed on

User input

User output

User input and the resultant output

None of given



Which of the following might require re-baselining of the cost baseline?

Corrective action

Revised cost estimates

Updates to the cost management plan

Budget updates



________ identify which quality standards are relevant to the project and determines how to satisfy them



Sponsored Links

Quality planning

Quality assurance

Quality control

Process control