Question No: 1 ( Marks: 1 ) - Please choose one
In order to measure the design quality, if the frequency of ripple defects is too large, then it means that there is tight coupling and hence the



► design is maintainable
► design is not maintainable



► design has completed



► none of the given




Question No: 2 ( Marks: 1 ) - Please choose one
We can include following type of data in the database for creating matrix aganst each project except



► name of project



► size of project



► company’s CEO name



► cost of project




Question No: 3 ( Marks: 1 ) - Please choose one
The only reason for an estimate to be unreliable is lack of experience related to the application on the part of the estimator.



► true
► false

Question No: 4 ( Marks: 1 ) - Please choose one
A consideration of software scope must include an evaluation of all external interfaces.



► true
► false

Question No: 5 ( Marks: 1 ) - Please choose one
If an error related to requirements is identified in testing phase, so this error will be considered as an error in ___________ phase.



► Design



► Code



► Requirement



► Testing



Question No: 6 ( Marks: 1 ) - Please choose one
Usually the performance of the organization change over-night.



► True



► False




Question No: 7 ( Marks: 1 ) - Please choose one
Quality is the compliance of software to implicit and explicit quality factors. Identify the explicit requirement from the following:



► Maintainability



► Compliance with CMMI



► Ease of use



► Efficiency




Question No: 8 ( Marks: 1 ) - Please choose one
Following are the benefits of conducting review except







► Help in finding the size of the project



► Helps in verifying the quality of product



► Help in identifying where improvement is required.
► Helps in identifying the bugs in the work product




Question No: 9 ( Marks: 1 ) - Please choose one
Mean Time To Repair (MTTR) is the



► Time when system remained unable for usage



► Time taken to fix the error



► Time taken to repair the software



► All of the given options are correct.




Question No: 10 ( Marks: 1 ) - Please choose one
Reliability and Safety are same concepts with respect to software quality



► True
► False

Question No: 11 ( Marks: 1 ) - Please choose one
SCM is the requirement of the ________ level(s) of CMM



► First



► Second and later



► Third and later



► Only Second




Question No: 12 ( Marks: 1 ) - Please choose one
We can include following items during configuration item identification:



► User Manuals and Documentations



► Source Code



► Software Requirement Specifications



► All of the given choices are correct




Question No: 13 ( Marks: 1 ) - Please choose one
If a new version of a product is released by fixing the bugs in the previous release then it is termed as _________________
► Product Update



► Product Upgrade



► Defect Removal







► Product Performance

Question No: 14 ( Marks: 1 ) - Please choose one
Every node signifies ___________ version of a release



► one



► two



► three



► four





Question No: 15 ( Marks: 1 ) - Please choose one
The Change Control Authority does not have the rights to permit to bring the change in the software
► True



► False




Question No: 16 ( Marks: 1 ) - Please choose one
Check in and Check out is actually one and the same process with two different names



Sponsored Links









► True
► False

Question No: 17 ( Marks: 1 ) - Please choose one
There could be multiple GUIs to satisfy one requirement



► True



► False








Question No: 18 ( Marks: 1 ) - Please choose one
_____________ is the process of Design recovery. At this stage the documentation of the overall functionality is created.







► Database Engineering
► Reverse Engineering







► Refactoring
► Forward Engineering

Question No: 19 ( Marks: 1 ) - Please choose one
In code restructuring, we do not change the functionality of the code







► True



► False




Question No: 20 ( Marks: 1 ) - Please choose one
In ______________, new user and technology requirement can also be integrated into the re-engineering effort.







► Backward re-engineering



► Forward re-engineering



► Business Engineering



► Business Process Engineering




Question No: 21 ( Marks: 1 ) - Please choose one
A _____________process is “a set of logically related tasks performed to achieve a defined business outcome”.



► Business



► Software



► CMM



► ISO




Question No: 22 ( Marks: 1 ) - Please choose one
Software refactoring is a process in which







► External behavior of the system does not change



► Internal behavior of the system does not change



► Design of the software changes



► Architecture of the software changes




Question No: 23 ( Marks: 1 ) - Please choose one
The formal methods model of software development makes use of mathematical methods to




► define the specification for computer-based systems
► all of the given



► develop defect free computer-based systems



► verify the correctness of computer-based systems


Question No: 24 ( Marks: 1 ) - Please choose one
Which one of the following describes the data and control to be processed, function, performance, constraints, interfaces, and reliability?







► Product Quality



► Software scope estimation



► Resources requirements



► Time requirements




Question No: 25 ( Marks: 1 ) - Please choose one
Which one of the following describes the data and control to be processed, function, performance, constraints, interfaces, and reliability?







► Resources requirements



► Software scope estimation



► Time requirements



► Product Quality




Question No: 26 ( Marks: 1 ) - Please choose one
The software plan is not a static document, it is frequently adjusted to make the project appear on track to meet all deadlines and quality targets.
► True
► False
Question No: 27 ( Marks: 1 ) - Please choose one
The projects are classified into following categories except



► New application development



► Reengineering projects



► Concept development projects



► Marketing Development Projects




Question No: 28 ( Marks: 1 ) - Please choose one
The processes at ----------- is focus on continually improving process performance through both incremental and innovative technological changes/improvements.











► Level 5
► Level 1
► Level 4
► Level 3

Question No: 29 ( Marks: 1 ) - Please choose one
Quantitative process-improvement objectives for the organization are established, continually revised to reflect changing business objectives at -------------.







► Level 3
► Level 2
► Level 5
► Level 1

Question No: 30 ( Marks: 1 ) - Please choose one
Reliability of a software is a



► functional requirement
► non-functional requirement
► Design Requirement
► None of the given

Question No: 31 ( Marks: 2 )
What issues must be included in the review list?




Question No: 32 ( Marks: 2 )
What is meant by requirement management?

Requirement Management is defined as a systematic approach to eliciting, organizing, and documenting the requirements of the system, and a process that establishes and maintains agreement between the customer and the project team on the changing requirements of the system.








Question No: 33 ( Marks: 2 )
Give any two advantages of Software CMM?




Question No: 34 ( Marks: 2 )
How can we implemente metrics in small organizations ?




Question No: 35 ( Marks: 3 )
Give in brief any three factors related with operation?




Question No: 36 ( Marks: 3 )
Discuss the hazards those are associated with a computer-based cruise control for an automobile?




Question No: 37 ( Marks: 3 )
What would you understand by the conventional numbering of the product release?



Question No: 38 ( Marks: 3 )
Write down the levels of Capability Maturity Model (starting from 0-5)?



Question No: 39 ( Marks: 5 )
What are the risks associated in the migration of a Legacy system to a new system?




Question No: 40 ( Marks: 5 )
How Duplicate Code can cause problem in the maintenance of a program? Explain briefly.