In Bold Letters it is the answer of the mcq'sView more random threads:
- 3rd quiz of MGT603
- ENG101 English Comprehension Solved Quiz No.1 Fall Semester...
- cs614 dataware house solved quiz for 2012
- MGT501 -Human Resource Management Online Solved MCQS Quiz...
- cs614 dataware house solved quiz no 2 on 18 november 2011
- CS506 WEB DESIGN AND DEVELOPMENT all solved quiz fall 2010
- cs507 information system solved quiz and mcq's
- CS304 Object Oriented Programming Solve Quiz No.2 Fall...
- MGT502 current quiz solved with huge databank
- CS601 Data Communication Solved Quiz No. 3 Solutions...
download the file
.........technique was initially developed for manufacturing processes in the 1920’s by Walter Shewart.
Contorl chart
When more than one users interpret the same requirement in different ways then we can say that the requirement is:
If we plot a graph between defects reported, and defects fixed then:
Difference between defects reported and fixed will show the defects yet to be fixed
Control charts are of following two types:
Moving range control charts and Individual control charts
For a software the total number of requirements are equal to ________
Functional requirements + non functional requirements
Quality can be measured if we measure the _____ of the product.
Correctness
Identify the TRUE statement:
Same process metrics may vary from project to project
In context of moving range and individual control charts, LNPL stands for:
Lower Natural Process Limit
Identify the most appropriate statement:
The quality of the software specification is of extreme importance.
_______ is the measure of how many defects are removed by the quality assurance processes before the product is shipped for operation.
Defect removal efficiency
Sponsored Links